Firemonitor Tower for BPCL

Location: JNPT Port

PROJECT DETAILS

This is a approximately 20m tower, with automated fire monitoring equipment and water jet mounted on top.

CHALLENGES FACED

The tower required access at top for operations and maintainence. A Spiral staircase was conceptualized either external or internal and appraised to the client. Finally an internal staircase was taken. Indepth detailing was provided for the staircase and upper deck.

HOW CLIENT BENEFITTED WITH VALUEMIZE

Apart from submitting the 2D drawings and calculations, a 3D BIM model was prepared for this project as capability development on a major Steel detailing software. The above photo denotes the 3D model.